5G Investment News
  • Top News
  • Economy
  • Forex
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
5G Investment News
  • Top News
  • Economy
  • Forex
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
5G Investment News
No Result
View All Result
Home Stock

ERC sets final prices for 4th green energy auction

by
June 15, 2025
in Stock
0
ERC sets final prices for 4th green energy auction
STOCK PHOTO | Image by jcomp from Freepik

THE Energy Regulatory Commission (ERC) has issued the final ceiling prices for the fourth round of the Green Energy Auction (GEA-4), which will offer 10,653 megawatts (MW) of renewable energy (RE) capacities.

In a resolution, the ERC set the green energy auction reserve (GEAR) price at P5.68 per kilowatt-hour (kWh) for ground-mounted solar, P4.4832 per kWh for rooftop solar, and P6.5258 per kWh for floating solar.

For other technologies, the commission set the GEAR price at P6.0859 per kWh for onshore wind and P5.4028 per kWh for solar systems equipped with energy storage.

The GEAR price serves as the maximum price in pesos per kWh that will be used as the basis for bid offers during the auction.

Most of the final prices are higher than the preliminary figures after the ERC received comments from stakeholders and conducted public consultations.

In a recent advisory, the Department of Energy (DoE) raised the total capacity for floating solar in the Visayas due to regional demand and increased investor interest.

Under GEA-4, developers may compete for 3,940 MW of ground-mounted solar, 48 MW of rooftop solar, 3,175 MW of floating solar, 2,390 MW of onshore wind, and 1,100 MW of solar with energy storage.

In a statement on Saturday, the DoE said the auction proper is scheduled for Sept. 2. The list of winning bidders will be released on Oct. 22.

As a flagship government initiative, the program is expected to support the target of increasing the RE share in the country’s power generation mix to 35% by 2030.

“With over 10 gigawatts of solar and wind capacity up for auction — targeted for commercial operations from 2026 to 2029 — this round aims to boost the RE share in the country’s energy mix, strengthen grid reliability, and ensure energy security,” the DoE said.

“GEA-4 not only promotes increased investment in RE, but also affirms the DoE’s commitment to competitive, transparent, and efficient energy procurement practices,” it added. — Sheldeen Joy Talavera

Previous Post

Motoring ahead

Next Post

University of the Philippines chemists explore safer methods for detecting methanol in lambanog for MSMEs

Next Post
University of the Philippines chemists explore safer methods  for detecting methanol in lambanog for MSMEs

University of the Philippines chemists explore safer methods for detecting methanol in lambanog for MSMEs

Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.







    Fill Out & Get More Relevant News





    Stay ahead of the market and unlock exclusive trading insights & timely news. We value your privacy - your information is secure, and you can unsubscribe anytime. Gain an edge with hand-picked trading opportunities, stay informed with market-moving updates, and learn from expert tips & strategies.
    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    Recommended

    Marcos orders oil contingencies

    Marcos orders oil contingencies

    June 17, 2025
    Incoming lawmakers urged to focus on economic measures

    Incoming lawmakers urged to focus on economic measures

    June 17, 2025
    Infrastructure shortfalls hurt PHL competitiveness

    Infrastructure shortfalls hurt PHL competitiveness

    June 17, 2025
    PHL to implement crypto-asset framework

    PHL to implement crypto-asset framework

    June 17, 2025

    Disclaimer: 5GInvestmentNews.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice.
    The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 5GInvestmentNews. All Rights Reserved.

    No Result
    View All Result
    • Home
    • Privacy Policy
    • suspicious engagement
    • Terms & Conditions
    • Thank you

    © 2025 JNews - Premium WordPress news & magazine theme by Jegtheme.