5G Investment News
  • Top News
  • Economy
  • Forex
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
5G Investment News
  • Top News
  • Economy
  • Forex
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
5G Investment News
No Result
View All Result
Home Stock

MWSS says P1.93-B aqueduct may be completed next year

by
January 8, 2026
in Stock
0
MWSS says P1.93-B aqueduct may be completed next year
PHILSTAR FILE PHOTO

By Sheldeen Joy Talavera, Reporter

A P1.93-BILLION aqueduct that will provide additional raw water transmission capacity and ensure continuous flow of raw water to Metro Manila and nearby provinces is targeted for completion next year.

In an interview with BusinessWorld, Patrick James B. Dizon, department manager at the Metropolitan Waterworks and Sewerage System (MWSS) Corporate Office, said the construction is ongoing for the replacement aqueduct.

An aqueduct is a structure built to transport water over long distances from a water source to where it is needed.

The Aqueduct Number 7 Project stretches a total of 15 kilometers from Bigte Basin in Norzagaray, Bulacan to Novaliches Portal in Lamesa Dam, Quezon City. The water infrastructure is designed to carry up to 1,857 million liters per day (MLD) of water.

The new aqueduct replaces the aging Aqueducts 1 and 2, which was constructed in 1939 and 1948, respectively, and can only deliver 300 MLD.

Mr. Dizon said that the project is funded by MWSS’ concessionaires — Maynilad Water Services, Inc. and Manila Water Co., Inc. — and is jointly implemented by all three parties.

The new aqueduct will be connected to the Angat Water Transmission Improvement Project Tunnel No. 5. The tunnel spans from Ipo Dam to Bigte Basin and carries a raw water supply of 1,642 MLD.

The P3.25-billion tunnel, which was completed in November last year, aims to upgrade the Umiray-Angat-Ipo-La Mesa water conveyance system that was built in the 1930s and 1960s.

Tunnel No. 5 is an addition to the Tunnel No. 4 which was constructed in 2020, providing redundancy so older tunnels and aqueducts can undergo maintenance or rehabilitation without interruption of water supply.

Patrick Lester N. Ty, chief regulator at the MWSS Regulatory Office, said that the completion of the two tunnels paves the way for the possible rehabilitation of aging tunnels.

“With the operation of tunnels 4 and 5, MWSS can now initiate the detailed investigation and assessment of Tunnels 1-3 whether for rehabilitation or decommissioning,” he said.

Previous Post

BIR files P48.39-M tax raps against contractor in Bulacan ‘ghost’ project

Next Post

Year-long state of calamity raises need for greater gov’t spending oversight

Next Post
Year-long state of calamity raises need for greater gov’t spending oversight

Year-long state of calamity raises need for greater gov’t spending oversight

Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.







    Fill Out & Get More Relevant News





    Stay ahead of the market and unlock exclusive trading insights & timely news. We value your privacy - your information is secure, and you can unsubscribe anytime. Gain an edge with hand-picked trading opportunities, stay informed with market-moving updates, and learn from expert tips & strategies.
    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    Recommended

    Wage hike for domestic workers eyed

    Wage hike for domestic workers eyed

    January 12, 2026
    Meralco rates go down in January

    Meralco rates go down in January

    January 12, 2026
    ‘Tiis ganda no more?’ Filipinos’ digital patience may wane over time

    ‘Tiis ganda no more?’ Filipinos’ digital patience may wane over time

    January 12, 2026
    Telco landscape to see major shifts, investment growth — analysts

    Telco landscape to see major shifts, investment growth — analysts

    January 12, 2026

    Disclaimer: 5GInvestmentNews.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice.
    The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 5GInvestmentNews. All Rights Reserved.

    No Result
    View All Result
    • Home
    • Privacy Policy
    • suspicious engagement
    • Terms & Conditions
    • Thank you

    © 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.